This weekend we tackled the bathroom. I have been waiting for this moment for MONTHS. The old bathroom wasn't that great or that bad when we moved in, but once we used the bathroom as the staging area for all the tools, paint, and grim from all of our other projects, it was really horrible.
The bathroom then:
Putting down the hardy back.
The tiles by the door.
The little natural stones go all the way around and then the big ones are in the middle.
We are in process of putting in the toilet and sink as I type (just letting the paint dry).
Almost all the credit fro the bathroom goes to Catlin who did all the tile work. And ISSB who aided and assisted him.
The bathroom then:
Putting down the hardy back.
The tiles by the door.
The little natural stones go all the way around and then the big ones are in the middle.
We are in process of putting in the toilet and sink as I type (just letting the paint dry).
Almost all the credit fro the bathroom goes to Catlin who did all the tile work. And ISSB who aided and assisted him.
2 comments:
>>>>I am thankful for ISSB<<<<
and tile layer. It's looking great!
Tooo
Must run in the fam. Ask him about his sister!
Post a Comment